Subway renovation; another change of the traffic system of the Árpád bridge

Next Monday another change to be expected in the Váci út and Róbert Károly körút intersection of the 3 metro renovation preparations – has informed on Friday the BKV told MTI.

August 21 is closed and the whole week closed the Main road to the left of the Árpád bridge in the direction of turn to outside traffic lanes of the same direction inside lane and periodically at night will not be viable. In addition, sávszűkítésre need to calculate the tramway track on áthajtásos during.

The BKV will continue to maintain the previously introduced sávlezárás.

Like this post? Please share to your friends:
Leave a Reply